|
||||||||
|
Technical Specifications General Information Technical Specificaions Theatre Diagram General Dimensions
Loading All loading occurs directly from the 15th Street entrance, and access to the house is through a standard door that separates the house from the lobby. Therefore, All pre-built scenery must not exceed 6-10x 2-10. Additionally, there are 4 stairs in the lobby; all rolling boxes must be lifted or the tenant may use a ramp (not provided). Deck Ό Masonite deck painted black with a Ύ Plywood subfloor on a poured concrete base. Raised black plywood floor 18" higher than the Masonite deck installed 6/04 for sight line purposes. Entrances The entrance onto the stage from the dressing room area is upstage right. Additional entrances can be made from the house. F/X Tenant must notify the DR2 of any F/X to be used three weeks prior to the first performance. This includes fog, smoke, cigarettes, flames, and water. All F/X must be approved by the General Manager before use. Rigging
Soft Goods
Dressing Rooms
Additional Inventory
Lighting The DR2 is hung with a basic rep plot. This simple plot should serve the basic needs of most tenants. The DR2 has the capability to accommodate more dimming and instruments if needed. Please talk to the General Manager for more information. Dimming
Inventory
Console
Playback
Speakers / Amps
Effects / Processing:
Accessories
Communication / Monitors:
|
|||||||